Quantity Surveying Building Estimation BBS with Excel & CAD

Quantity Surveying, Construction Estimation ,Quantity survey ,Cost Estimation ,Civil engineering, Building Estimation

Ratings 4.51 / 5.00
Quantity Surveying Building Estimation BBS with Excel & CAD

What You Will Learn!

  • Quantity Survey, Estimation & Costing Of Industrial Building & Hostel Building Of G+2 ( Excavation To Finishing )
  • Able to take Entry level Jobs As a Quantity Surveyor & Estimator
  • Bar Bending Schedule Of Footing, Column, Beam & Slab (Foundation To Roof Level)
  • Preparing Boq For Pcc, Excavation, Plastering, Concreting, Tmt Steel Etc
  • Basic Rate Analysis For Various Items ( PCC, RCC & SHUTTERING )
  • Quantity Estimation For Sump Tank & Flag Pole Foundation
  • Thumb Rules For Quick Calculations Of Shuttering Materials, Concreting , Centering, Plyboard & Props Required
  • Excel Basic Commands And How To Prepare & Use Excel Sheets For Quick Calculations
  • Case Studies Of 5bhk House With Interiors Estimation
  • Become a Quantity Estimator & Estimate Any Building Like Professional
  • Estimate any Building or House Plans with Quick thumb Rules
  • Quantity Estimation Of Brickwork, Blockwork, Plastering, Painting, Electrical Tiling Etc

Description


Keywords : Quantity survey , quantity surveying estimation,  quantity surveyor Estimation, Construction Management Construction Claims, Civil Engineering ,construction estimation, cost estimation ,construction management, procurement



OVERVIEW OF COURSE

  • SUB STRUCTURE QUANTITY TAKE OFF ( EXCAVATION, SAND FILLING, PCC, BACK FILLING OF FOOTING & COLUMN TILL PLINTH BEAM LEVEL )

  • SUPER STRUCTURE QUANTITY TAKE OFF  ( PLINTH BEAM,FLOOR BEAM, FLOOR SLAB , ROOF BEAM, ROOF SLAB )

  • FINISHING ACTIVITIES ( PLASTERING, WALL PUTTY, PAINTING , CEILING PLASTERING, CEILING PUTTY, WALL PAPER, ELECTRICAL ETC )

  • ESTIMATION & COSTING OF DOG LEGGED STAIRCASE

  • COMPLETE ESTIMATION & COSTING OF G+2 HOSTEL BUILDING ( EXCAVATION, BACK FILLING, PCC, FOOTING, BEAM, SLAB & STAIRCASE )

BAR BENDING SCHEDULE

  • Bar Bending of Isolated & Combined Footing

  • Bar-bending Schedule Of Column Necks And Columns up to G+2 ( Manual + Excel )

  • Bar-bending Schedule Of Simply Supported Beam, Continuous Beam, Top Extra, Bottom Curtail & Side Face Reinforced Beams

  • Bar Bending Schedule Of One way Slab, two way Slab, one way Continuous Slab ( Manual + Excel + PPT)

RATE ANALYSIS FOR VARIOUS WORKS

  • Rate Analysis for PCC

  • Rate Analysis for RCC

  • Rate Analysis for Brickwork

  • Rate Analysis for Block work

  • Rate Analysis for wall Plastering

  • Rate Analysis for ceiling Plastering

  • Rate Analysis for Tiling

  • Rate Analysis for Reinforcement Works

Thumb Rules for Quick Calculations of Shuttering & Concrete Materials

  • Thumb rule for finding Footing Shuttering Quantity with footing Concrete Quantity.

  • Thumb rule for Finding Beam, Column & Slab Shuttering & Centering Quantity with Concrete Quantity.

  • Quick thumb rules for finding Steel for Slab, Beam, Column .

Bill Of Quantity (B.O.Q)

  • BOQ For Excavation & Back filling of Soil

  • BOQ  For PCC, Concrete( M-15, M-20 ) & TMT Steel

  • BOQ For all Finishing Activities ( Plastering, Brickwork, Wall putty , ceiling Plastering, Painting etc )

MISCELLANEOUS  LECTURES

Estimation & Costing of  Under Ground Water tank of 50 Kl ( EXCEL CALCULATIONS )

Estimation & Costing of Flag pole Foundation ( Raft Foundation & RCC Pedestal Covered )

Estimation & Costing of 5 BHK House Plan with all Interiors ( Case Study )

All Explanation has Been done with Live Project Photos & videos .



Who Should Attend!

  • QUANTITY ESTIMATORS, BAR BENDERS, CIVIL ENGINEERS, STRUCTURAL ENGINEERS, PLANNING ENGINEERS, QUANTITY SURVEYORS , PROCUREMENT ENGINEERS
  • EXCEL LEARNERS

TAKE THIS COURSE

Tags

  • Construction Estimation

Subscribers

7032

Lectures

166

TAKE THIS COURSE