In this course titled "Construction Sequence+ Drawing Reading with [Site Videos]" we will understand the sequence in which the construction work takes place. In this first phase of updates.
"Thinlu Project" is the main project. Along with that, we will be discussing two to three other projects from the underground water tank construction stage. The projects are residential in nature.
We have added content such as:
1. Clearing of site
2. Grid marking
3. Footing marking
4. Overview of Excavation and PCC work
5. Column Marking
6. Bar Bending Work on site
7. Casting of Footings
8. Neck Column Casting
9. Back Filling
10. SSM Work
11. Plinth Beam Casting
12. Back Filling
13. PCC Work on the Ground Floor Level
14. Column Casting for Superstructure.
15. Staircase Work on Multiple Sites.
16. Beam and Column Casting.
The goal of this course is to help engineers get an idea about how the construction work is carried out on-site, and how we need to produce drawings for the construction purpose. We are confident that upon the completion of this course. The engineer will gain a fair amount of idea as to what goes on site, and how to deal with issues related to the site as and when they appear.
All the best!