In this eighth of eight classes your final class we will do a final walk-through. Starting on the exterior we will look at drainage concrete flat work exterior wall covering Windows doors and roof. Will cover the main and second level looking for any items which have not been completed and suggesting other safety considerations. In the attic who will be looking at the framing, insulation and furnace. In the basement we will be checking the framing insulation and garage. This would be considered the last walk-through prior to closing.