Step by Step Design of 950TR HVAC Plant Room in Revit MEP

Learn Complete Workflow of BIM Revit from Design to Documentation by Building a Real Time HVAC Plant Room Project

Ratings 4.53 / 5.00
Step by Step Design of 950TR HVAC Plant Room in Revit MEP

What You Will Learn!

  • BIM / REVIT MODELLING
  • BIM / REVIT ESTIMATION
  • BIM / REVIT DOCUMENTATION
  • When you complete this course you will have the skills and knowledge to take a project from start to finish.
  • CHILLED WATER PIPE DESIGNING
  • HOW TO CONVERT 2D CAD LAYOUTS TO 3D BIM REVIT MODEL
  • VALVES & ACCESSORIES CONNECTIONS FOR CHILLER , PUMPS , COOLING TOWER
  • 3D DESIGNING & MODELLING OF HVAC PLANT ROOM
  • HOW TO WORK WITH LINKED CAD FILES
  • GET HANDS ON EXPERIENCE ON REALTIME PROJECT BY DOWNLOADING THE REVIT FAMILIES PROVIDED IN THIS COURSE
  • REVIT MEP MODELLING BEST PRACTICES
  • REAL TIME PROJECT MODELLING
  • REVIT MEP SECRET TIPS & TRICKS

Description

THIS COURSE IS DIVIDED INTO 3 SECTIONS, WHICH ARE

1. DESIGN & MODELLING

2. PROJECT ESTIMATION

3.PROJECT DOCUMENTATION.

DETAILED COURSE SYLLABUS IS AS FOLLOWS:

SECTION 1 - DESIGN & MODELLING

1. UNDERSTANDING PROJECT BRIEF

2. LINKING CAD FILE IN REVIT

3. CREATING ARCHITECTURAL ELEMENTS(FLOOR/WALLS/FOUNDATIONS)

4. HOW TO ADD MATERIALS ON EQUIPMENTS

5. CHILLED WATER PIPE SIZING (CARRIER STD)

6. PLACING EQUIPMENTS(CHILLER/PUMPS/COOLING TOWER)

7. HOW TO CREATE PIPE TYPES

8. HOW TO CREATE PIPING SYSTEMS(CHWS/CHWR/CWS&R)

9. PLACEMENT OF HEADER PIPES

10. ADDING BRANCH CONNECTIONS TO CHILLER/PUMPS (AUTOMATIC & MANUALLY)

11. CHILLER HOOKUP

12. PUMP HOOKUP

13. COOLING TOWER HOOKUP

14. PLACEMENT OF VALVES & ACCESSORIES REQUIRED FOR CHILLER , PUMP ,COOLING TOWER.


SECTION 2 - PROJECT ESTIMATION

1. INTRODUCTION TO PARAMETERS

2. CLASSIFICATION OF PARAMETERS.

3. HOW TO CREATE SHARED PARAMETERS.

4. ESTIMATION OF TOTAL PIPE QUANTITY IN REVIT

5. SCHEDULE PREPARATION FOR CHILLED WATER & CONDENSER WATER PIPE.

6. ESTIMATION OF TOTAL PIPE COST USING SCHEDULES (BOQ PREPARATION).

7. ESTIMATION OF TOTAL ACCESSORIES QUANTITY

8. ESTIMATION OF TOTAL VALVES QUANTITY.

9. HOW TO PREPARE A DETAILED CHILLER SCHEDULE.

10. HOW TO PREPARE A DETAILED HVAC PUMPS SCHEDULE

11. HOW TO PREPARE A DETAILED COOLING TOWER SCHEDULE


SECTION 3 - PROJECT DOCUMENTATION

1. HOW TO CREATE & EDIT A TAG

2. WORKING WITH TEXTS

3. HOW TO DETAIL A FLOOR PLAN

4. HOW TO CREATE & APPLY VIEW FILTERS.

5. HOW TO CREATE & APPLY VIEW TEMPLATE.

6. HOW TO CREATE & EDIT SHEETS.

7. HOW TO CREATE A DETAILED SECTION VIEW

8. HOW TO CREATE AN EQUIPMENTS SCHEDULE SHEET.

9. HOW TO CREATE A DRAWING LIST

10. HOW TO ADD REVISIONS ON SHEET

11. PRINTING & PLOTTING SETTINGS IN REVIT.

12. CONVERTING REVIT TO PDF

13. CONVERTING REVIT TO CAD

Who Should Attend!

  • MECHANICAL ENGINEERS, ELECTRICAL ENGINEERS , ARCHITECTS
  • MEP PROFESSIONALS
  • HVAC ENGINEERS
  • PIPING ENGINEERS

TAKE THIS COURSE

Tags

  • Revit
  • Plant Design
  • HVAC

Subscribers

413

Lectures

44

TAKE THIS COURSE