Testing Commissioning 115 KV GIS Part 2

Testing Gas Insulated Substation

Ratings 4.61 / 5.00
Testing Commissioning 115 KV GIS Part 2

What You Will Learn!

  • Advantages of GIS : Gas Insulated Switchgear (Substation)
  • Challenges of Testing Gas Insulated Substation
  • How to Use Earth Switch in Testing ?
  • Test Contact Resistance of the Circuit Breaker By Conventional Method
  • Test Contact Resistance of the Circuit Breaker By DualGrounding Method
  • Test Contact Resistance of the 115 KV GIS BusBar
  • Timing Test of the Circuit Breaker
  • Timing Test of the Isolator Switch
  • Timing Test of the Earth Switch
  • 10 KV Test For Earth Switch
  • Challenges of Testing Instrument Transformers
  • The Purpose of The Characteristic Test in Current Transformer
  • The Importance of The CT Loop Test
  • The Purpose of The Primary Test in Current Transformer
  • The Purpose of The Characteristic Test in Voltage Transformer
  • The Importance of The VT Loop Test
  • Which is better MRCT or CT Analyzer with Current Transformer Tests ?
  • Functional and Interlocking Test
  • The Purpose of The BusBar Stability and Sensitivity Test
  • The Importance of The High Voltage Test
  • Partial Discharge Sensors
  • how to Test Partial Discharge in Site ?

Description

Dear fellows,

This is the most comprehensive online training of gas insulated substation . Here you will learn all thing about GIS.


Gas insulated substations are the most common type of substation that you will find on the electrical network, due to their  effectiveness and simplicity.


This course will give you an appreciation of how to Testing,commissioning this type of substation and introduce you to all of the equipment's that you will find in a typical gas insulated substation.



we will go through the following topics

  • Advantages of GIS : Gas Insulated Switchgear (Substation)

  • Challenges of Testing Gas Insulated Substation

  • How to Use Earth Switch in Testing ?

  • Test Contact Resistance of the Circuit Breaker By Conventional Method

  • Test Contact Resistance of the Circuit Breaker By DualGrounding Method

  • Test Contact Resistance of the 115 KV GIS BusBar

  • Timing Test of the Circuit Breaker

  • Timing Test of the Isolator Switch

  • Timing Test of the Earth Switch

  • 10 KV Test For Earth Switch

  • Challenges of Testing Instrument Transformers

  • The Purpose of The Characteristic Test in Current Transformer

  • The Importance of The CT Loop Test

  • The Purpose of The Primary Test in Current Transformer

  • The Purpose of The Characteristic Test in Voltage Transformer

  • The Importance of The VT Loop Test

  • Which is better MRCT or CT Analyzer with Current Transformer Tests ?

  • Functional and Interlocking Test

  • The Purpose of The BusBar Stability and Sensitivity Test

  • The Importance of The High Voltage Test

  • Partial Discharge Sensors

  • how to Test Partial Discharge in Site ?


Who Should Attend!

  • Anyone interested in electrical engineering
  • Electrical undergraduates
  • Electrical graduates
  • Workers in the electrical utility industry
  • Electricians