What You Will Learn!

  • MCB Test (2 pole & 3 pole) { Pick up current }
  • Auxiliary Relays Test ( Pick up & Drop off Timing - Relay Pick up & Drop off Voltage/current - Relay Burden )
  • Current Transformer Test (Insulation Resistance Test - CT Characteristics Test - CT Loop Resistance Test -CT Primary Injection Test )
  • Voltage Transformer Test (Insulation Resistance Test -VT Ratio & Polarity Test -Winding Resistance Test)
  • CB Timing Test ( O - C - OC - CO - OCO )
  • Contact Resistance Test For ( CB & Busbar )
  • Busbar High Voltage Test
  • Maintenance and troubleshooting guidelines for MV SwitchGear
  • The philosophy of operation for main AC distribution panel
  • The important of auto transfer switch with main AC distribution panel
  • Why we should make change over with DC in control circuit of bus coupler ?
  • The philosophy of operation for main DC distribution panel
  • Is it possible to operate two battery chargers in parallel at the same time with the same loads?

Description

Hi my friend !

  • Looking for a COMPREHENSIVE course about Testing Commissioning MV SwitchGear for Stations ,Switchgears Substations & Distribution Zones ?


If your answer is YES, then you're definitely in the right place

Why this course is Powerful and Unique ?

The course contents are arranged in a progressive manner to start from beginner level to advanced one

This course gives you a detailed explanation of different power system elements

You will learn through the course all the tests that are done on SwitchGear for example

1- MCB Test (2 pole & 3 pole) {  Pick up current }

2- Auxiliary Relays  Test ( Pick up & Drop off Timing -  Relay Pick up & Drop off Voltage/current - Relay Burden )

3- Current Transformer Test (Insulation Resistance Test - CT Characteristics Test -  CT Loop Resistance Test -CT Primary Injection Test )

4- Voltage Transformer Test (Insulation Resistance Test -VT Ratio & Polarity Test -Winding Resistance Test)

5- CB Timing Test ( O - C - OC - CO - OCO )

6- Contact Resistance Test For ( CB & Busbar )

7- Busbar High Voltage Test

8- Maintenance and troubleshooting guidelines for MV SwitchGear

9- The philosophy of operation for  main AC distribution panel 

10- The important of auto transfer switch with main AC distribution panel 

11- Why we should make change over with DC in control circuit of bus coupler ?

12- The philosophy of operation for  main DC distribution panel 

13- Is it possible to operate two battery chargers in parallel at the same time with the same loads?


By the end of this course, you will be able to move from identifying all key components of Testing Commissioning SwitchGea to a complete understanding and adjustment of the setting of various protection functions.


I thank you very much for taking the time to check the course content.

I hope See you in the course !

Who Should Attend!

  • Anyone who wants to learn electric protection and control from scratch
  • Electrical Engineering Students
  • Electrical Engineering Graduates
  • Electrical Engineers who work in the field of substations and switchgears
  • Electrical Control Engineers
  • Electricians